CM-C056245 CF-C057484 EC-0001109
Home
>>
Departments
>>
Plumbing
>>
Plumbing Projects
Our Lady of Light Catholic Church - Fort Myers
November, 2005 - December, 2006
The new church is round, which created an additional challenge
for our plumbers when installing the hard copper tubing for the water system.
Copper tubing for the domestic water system hangs from the ceiling amongst the ductwork.
The baptismal fountain doesn't drain into the regular plumbing system, but into a well outside the building.
The PVC storm drainage piping hangs below the ductwork 20 feet in the air.
This page was updated on 10/30/07.