Much of the plumbing installation at the Cleveland Clinic involved working in the overhead space between the currently occupied 2nd floor and the new addition on the 3rd floor.
"Snapping" a piece of cast-iron drainage pipe
Overhead water lines in the new third-floor addition
This is where the newly-installed water lines tie into the existing water lines.