Baker Pre-K Center - Punta Gorda, FL
November, 2006 - June, 2007

The Baker Pre-K Center near downtown Punta Gorda is one of the newest additions
to the Charlotte County Public School system. B & I Contractors is also currently
doing plumbing work at two other new schools in Charlotte County.
Baker Pre-K Center, Punta Gorda, FloridaBaker Pre-K Center, Punta Gorda, FloridaBaker Pre-K Center, Punta Gorda, FloridaBaker Pre-K Center, Punta Gorda, FloridaBaker Pre-K Center, Punta Gorda, FloridaBaker Pre-K Center, Punta Gorda, FloridaBaker Pre-K Center, Punta Gorda, Florida



Mobile Mini plumbing storage container
PVC DWV-Sch40 Pipe & Fittings laydown area
Centex Construction
Mobile Mini plumbing storage container and PVC DWV-Sch40 Pipe & Fittings laydown area.
The plumbers are on lunch break now, but will be back to work soon enough.
Centex Construction is the General Contractor for this project.



Underground sanitary drain and vent piping
Underground sanitary drain and vent piping
Underground plumbing work in Area B consists of PVC DWV-Sch40 sanitary and vent
pipes for toilets, lavatories, and floor drains. The pipes sticking out of the ground, seen
here before the concrete is poured, will become student bathrooms in a few months.



Underground sanitary drain and vent piping
Area B building drain
The pipe pictured above left is for an outdoor drinking fountain; piping for a cleanout
is behind the drinking fountain inside the building. The larger pipe pictured above
right is the Area B building drain which will connect to the municipal sewer system.



Bobcat 328 Mini Excavator
Bobcat 328 Mini Excavator
Bobcat 328 Mini Excavator
B & I plumbers dig underneath a footer with the help of a mini-excavator. The Bobcat 328 from
Sunbelt Rentals is standard plumbing equipment during the underground phase.



Underground drain and vent piping system
Underground drain and vent piping system
Underground drain and vent piping system
These drain and vent pipes will be buried in dirt before the concrete floor is poured. When the
building is complete and the plumbing system is working correctly, most people will have no idea
there are thousands of feet of pipe buried below the floor.

Underground drain and vent piping system
Underground drain and vent piping system
Underground drain and vent piping system

Underground drain and vent piping system
Underground drain and vent piping system
Underground drain and vent piping system



Baker Pre-K Center
Baker Pre-K Center
Bathroom Group Stubouts
Baker Pre-K Center
Floor Drain installed in freshly poured concrete
Marcus Installing A Floor Cleanout
Water Closet Stubout Protecetd
Washer Supply & Outlet Box Installed In Block Wall